Clif Bar Bakery Plant
McAlvain placed over 13,000 CY of concrete in footings, foundations, slabs and concrete tilt-up for Clif Bar’s new 256,000 sf bakery in Twin Falls, Idaho. The project includes 108,530 sf of concrete tilt-up and over 256,000 sf of slab on grade that reach thickness up to 24”. Custom colored concrete tilt-up panels take the shape of snow capped mountain peaks with Clif Bar’s signature logo and suspended climber cast into the concrete.
Accolades:
- 13,700 CY of Concrete